Copy Cost Sets Dialog Box

Use this dialog box to copy existing cost sets to a project.

The Copy Cost Sets dialog box consists of two grids. The left grid displays the cost sets used in the selected project. The right grid displays the projects that the user has permission to access.

Location

To display the Copy Cost Sets dialog box, complete the following steps:
  1. Display the Project Properties dialog box.
  2. Select the Cost Sets tab and click Copy Cost Sets.